Trans Alaska Pipeline System
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Key facts
-
Summary and key issues
- Summary
- Key issues
- Throughput
- Tariff Rates
- Location maps
- Participation
-
Development
- Pump Stations
- Pipeline Specifications
- Pump station and control systems upgrade
- Maintenance
- Marine Terminals
- Operations
- Throughput
- Third party users
- Infrastructure
-
Costs
- Capital Expenditure
- Operating Costs
-
Sales contracts
- TAPS Quality Bank
- TAPS Tariffs
- Marine Transportation
- Fiscal and regulatory
-
Economic assumptions
- Cash flow
- Discount rate and date
- Inflation rate
- Global Economic Model (GEM) file
- Economic analysis
Tables and charts
This report includes 16 images and tables including:
- Key facts: Table 1
- Trans Alaska Pipeline System Map
- Participation: Table 1
- Liquids Throughput Profile
- Throughput: Table 1
- Economic analysis: Table 1
- Economic analysis: Table 2
- Economic analysis: Table 3
- Split of Revenues
- Cumulative Net Cash Flow - Undiscounted
- Cumulative Net Cash Flow - Discounted at 10% from 01/01/2024
- Remaining Revenue Distribution (Discounted at 10% from 01/01/2024)
- Pump Station 1 Schematic
- Valdez Marine Terminal Schematic
- Costs: Table 1
- Costs: Table 2
What's included
This report contains:
Other reports you may be interested in
Sullom Voe Terminal
Construction of the Sullom Voe Terminal (SVT) on the Shetland Islands was initiated in 1975 with the terminal receiving its first crude ...
$2,580US Alaska North Slope other fields (sub-commercial)
Data on the fields we currently classify as sub-commercial are available below. Sub-commercial fields contain hydrocarbon volumes that ...
$3,720Gassled-Norwegian Frigg Pipeline
The Frigg pipeline system comprises two pipelines that run southwest from the decommissioned cross-border Frigg field to St Fergus.
$2,580