The Trans Adriatic Pipeline (TAP) is the final section of Europe's Southern Gas Corridor. It currently delivers 970 mmcfd (10 bcm a year) or more of Azerbaijani gas from the BP-led Shah Deniz field to south Italy via Greece, Albania and the Adriatic Sea. The pipeline starts at the Greece-Turkey border, where it connects with the Trans-Anatolian Pipeline (TANAP), which transports Shah Deniz gas across Türkiye (Turkey).TAP's recent throughput has exceeded its design capacity and ...

Table of contents

  • Key facts
    • Summary
    • Key issues
  • Location maps
    • Operator
    • Corporate
      • Early participation (pre-2013)
      • Selection as Shah Deniz Phase Two export route (2013)
      • Subsequent ownership changes
    • Overview
      • Route
      • Project schedule
    • Key dates
      • Pre-FID
      • Post-FID
      • Commissioning
      • Expansion
    • Expansion plans
      • Initial expansion
      • Further expansion
    • Connecting infrastructure
      • Interconnector Greece-Bulgaria (IGB)
      • Interconnector Serbia-Bulgaria (ISB)
      • Ionian Adriatic Pipeline (IAP)
    • Key supplier information
      • Initial contracts (pre-2013)
      • TAP procurement process (2014-16)
    • Recent data
    • Initial capacity
    • Expansion capacity
      • Market tests
      • Initial expansion
      • Potential further expansion
      • Other considerations
    • Potential sources for further expansion
      • Additional Azerbaijani gas
      • Non-Azerbaijani gas
    • Capital costs
      • Initial project
      • Expansion plans
    • Financing
    • Tariff
      • Tariff methodology
      • Tariff modelling
    • Initial capacity
      • Overview
      • GSAs
    • Expansion capacity
      • Initial expansion
    • Regulatory framework
      • Intergovernmental agreements (IGAs)
      • EU
      • Exemptions
      • Greece
      • Albania
      • Italy
    • Fiscal overview

Tables and charts

This report includes the following images and tables:

  • Key facts: Table 1
  • Trans Adriatic Pipeline (TAP) map
  • Development: Table 1
  • Participation: Table 1
  • Throughput: Table 1
  • TAP throughput profile

What's included

This report contains:

  • Document

    Trans Adriatic Pipeline (TAP)

    PDF 5.91 MB

  • Document

    Trans Adriatic Pipeline (TAP)

    XLS 219.50 KB