Perenco-operated fields
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Key facts
-
Summary and key issues
- Summary
- Key issues
- Location maps
- Participation
- Geology
- Exploration
- Reserves and resources
- Production
-
Infrastructure
- Oil
Tables and charts
This report includes the following images and tables:
- Key facts: Table 1
- Index map
- Perenco-operated fields map
- Participation: Table 1
- Participation: Table 2
- Geology: Table 1
- Exploration: Table 1
- Reserves and resources: Table 1
- Production: Table 1
- Production: Table 2
- Infrastructure: Table 1
What's included
This report contains:
Other reports you may be interested in
Tors
The Tors development comprised two gas fields, Kilmar and Garrow.Kilmar was developed with a normally unmanned installation (NUI) tied ...
Nam Con Son Pipeline
The Nam Con Son Pipeline is a two-phase pipeline running from Block 06-1 to the Phy My power and industrial complex in south Vietnam.
$2,580Tenaz-operated fields (non-JDA)
Canada-based Tenaz Energy operates a portfolio of offshore gas fields in the Netherlands, outside of the Joint Development Area which ...
$3,720