Asset Report

Khazzan (Block 61)

Get this report*

$6,900

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

Khazzan is a major tight gas project in central Oman, around 280 kilometres southwest of capital Muscat. Operator BP took FID on the first phase of development in December 2013, achieving first gas 45 months later in September 2017. The field produces 1 bcfd of gas. A second phase of development, sanctioned in 2018, will increase output to 1.5 bcfd. The second phase is currently due onstream in 2021. The field is hugely technically challenging, but has seen significant cost reductions due to better than expected reservoir performance. There remains large upside through possible future expansion.

Table of contents

  • Key facts
    • Summary
    • Key issues
  • Location maps
  • Participation
    • Khazzan
  • Well data
    • BP appraisal programme
    • Recent appraisal
  • Reserves and resources
    • Emissions
    • Phase 1
      • Wells
      • Hydraulic fracturing
      • Drilling
      • Gas processing
      • Gas gathering
    • Phase 2 (Ghazeer)
      • Wells
      • Gas processing and gathering
      • Contracts
  • Infrastructure
    • Exploration and appraisal costs
    • Capital costs
  • 4 more item(s)...

Tables and charts

This report includes the following images and tables:

  • Key facts: Table 1
  • Index Map
  • Detail Map
  • Participation: Table 1
  • Well data: Table 1
  • Reserves and resources: Table 1
  • Reserves and resources: Table 2
  • Production: Table 1
  • Production: Table 2
  • Production Profile
  • Infrastructure: Table 1
  • Sales contracts: Table 1
  • 13 more item(s)...

What's included

This report contains:

  • Document

    Khazzan (Block 61)

    PDF 5.39 MB

  • Document

    Khazzan (Block 61)

    XLS 837.00 KB