Asset Report

Guillemot Area

Get this report*

$3,720

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

The Guillemot Area includes the Guillemot West, Guillemot North West, Clapham, Pict and Saxon fields. The fields lie to the west of the Gannet Area and were developed in conjunction with the Bittern accumulation, located 30 kilometres to the southeast of Guillemot West.The combined development is known as the Triton project. The Guillemot fields and Bittern all produce through subsea manifolds tied back to the purchased Triton FPSO. The Triton FPSO is managed by a joint team, with Dana ...

Table of contents

  • Key facts
    • Summary
    • Key issues
  • Location maps
  • Participation
  • Geology
  • Well data
    • Guillemot West and Guillemot North West
    • Clapham, Pict and Saxon
    • Future exploration
  • Reserves and resources
    • Emissions
    • Development drilling
    • Subsea facilities
    • Triton FPSO
    • Maintenance
  • Infrastructure
    • Capital costs
      • Guillemot West and North West
      • Clapham, Pict and Saxon
    • Decommissioning costs
      • Guillemot Area
    • Operating costs
      • Emissions Trading Scheme (ETS)
      • Guillemot West and North West
      • Clapham
      • Pict
      • Saxon
  • Fiscal and regulatory
    • Cash flow
    • Discount rate and date
    • Inflation rate
    • Oil price
    • Gas price
    • Carbon price
    • Exchange rate
    • Fiscal terms
    • Global Economic Model (GEM) file
    • Cash Flow

Tables and charts

This report includes 37 images and tables including:

  • Key facts: Table 1
  • Index map
  • Guillemot Area map
  • Participation: Table 1
  • Participation: Table 2
  • Participation: Table 3
  • Geology: Table 1
  • Well data: Table 1
  • Well data: Table 2
  • Well data: Table 3
  • Well data: Table 4
  • Reserves and resources: Table 1
  • Production: Table 1
  • Production: Table 2
  • Guillemot Area production profile
  • Infrastructure: Table 1
  • Infrastructure: Table 2
  • Development: Table 1
  • Cash flow (US$ million)
  • Economic analysis: Table 2
  • Economic analysis: Table 3
  • Split of Revenues
  • Cumulative Net Cash Flow - Undiscounted
  • Cumulative Net Cash Flow - Discounted at 10% from 01/01/2025
  • Remaining Present Value Price Sensitivities
  • Cash flow (£ million)
  • Economic analysis: Table 5
  • Economic analysis: Table 6
  • Costs: Table 1
  • Costs: Table 2
  • Costs: Table 3
  • Costs: Table 4
  • Costs: Table 5
  • Costs: Table 6
  • Costs: Table 7
  • Costs: Table 8
  • Costs: Table 9

What's included

This report contains:

  • Document

    Guillemot Area

    PDF 4.40 MB

  • Document

    Guillemot Area

    XLS 1.46 MB