Bacalhau and Bacalhau Norte (formerly Carcara)
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
-
Key Issues
- Development concept and phases
- Final investment decision (FID)
- Challenging full-cycle economics for Bacalhau Norte
- High-pressure reservoir presents challenges
- History
- Local content
- Unitisation
-
Gas
- Wells
- Oil
- Gas
- Operating costs
- Oil
- Gas
- Cash flow
- 2 more item(s)...
Tables and charts
This report includes the following images and tables:
- Field Hydrocarbon Characteristics
- Reserves (2P) at 01/01/2025
- Production (2024-2033)
- Production Profile - Bacalhau
- Production Profile - Bacalhau Norte
- Capital Costs 2020 to 2029 (US$ million)
- Operating Costs 2025 to 2034 (US$ million)
- Index Map
- Detail Map
- Current participation
- Cash Flow (US$)
- 15 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Polo Lagoa Parda
The Lagoa Parda cluster is composed of Lagoa Parda, Lagoa Parda Norte and Lagoa Piabanha fields. It is operated by Imetame Oil in ...
$3,720Sepia and Sepia Leste
Sépia (formerly Northeast of Tupi) is a pre-salt oil and gas discovery in Brazil's Santos basin. The field's reserves ...
$3,720El Descanso coal mine
A detailed analysis of the El Descanso coal mine.
$2,550