Ying zinc mine
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
- Key issues
- Mining
- Process
Tables and charts
This report includes the following images and tables:
- Detailed map
What's included
This report contains:
Other reports you may be interested in
Global zinc and lead mine cost summary
This global cost summary report examines production and cost trends in the zinc and lead mining industry.
$6,750Flin Flon (closed) copper smelter
A detailed analysis of the Flin Flon copper smelter.
$2,250Dias D'Avila copper smelter
A detailed analysis of the Dias D'Avila copper smelter.
$2,250