Wakayama steel plant
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
-
Key issues
- Participation
- Iron ore
- Coal
- Coke
- Metallics
-
Energy
- Downstream products
- Capital costs
- Operating cash costs
Tables and charts
This report includes the following images and tables:
- Detailed map
- Total operating cash costs - Finished steel
- Finished steel production
What's included
This report contains:
Other reports you may be interested in
PM305 & PM314 (Ceased)
Block PM305 & PM314 are located off the east coast of Peninsular Malaysia consisting of South Angsi, Kuning and Murai, currently ceased ...
$3,720MLNG upstream fields
The MLNG PSC covers five gas fields offshore Sarawak and was awarded in April 1997, replacing the 1976 Sarawak Shell PSC. Production from …
$3,720Block B - MLJ (LNG)
TotalEnergies' block in Brunei shallow water contains the Maharaja Lela, Maharaja Lela Deep, ML-4, ML-5, and ML-6 oil & gas fields
$3,720