Tulu Kapi is planned as an open pit operation utilising conventional drill, blast, load and haul mining methods. Ore will be processed in a 1.9-2.1Mtpa conventional carbon-in-leach (CIL) plant. The life of mine gold production is estimated to be 984koz.

Table of contents

  • Summary
  • Key issues
  • Mining
  • Processing
  • CAPEX

Tables and charts

This report includes the following images and tables:

  • Detailed map

What's included

This report contains:

  • Document

    Tulu Kapi Project gold mine

    XLS 113.50 KB

  • Document

    Tulu Kapi gold mine project

    PDF 1.06 MB