Asset Report

Ridder (Leninogorsk) copper mine

This report is currently unavailable

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

All mines and tailings retreatment supply the centralised Ridder concentrator producing separate copper, lead and zinc concentrates and a gravity precious metals concentrate. Zinc concentrates are treated at the Ridder smelter, lead and copper concentrates are transported to Ust-Kamenogorsk. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Summary
  • Key Issues
  • Mining
  • Process

Tables and charts

This report includes 2 images and tables including:

  • Ridder Emission Intensity Quartile ranking – tonnes of Cu equivalent
  • Detailed map

What's included

This report contains: