Pohang POSCO (BOF) steel plant
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
- Key issues
- Iron Ore
- Coal
- Metallics
- Energy
- Capital costs
- Operating cash costs
Tables and charts
This report includes the following images and tables:
- Detailed map
- Participation
- Steel plant overview
- Key raw materials rates
- POSCO's interest in iron ore assets, with remaining marketable reserves as of January 2015
- POSCO's interest in coal assets
- Downstream products
- Finished steel production
- Production table (Mt)
- Capital costs
- Total operating cash costs - Finished steel
- Operating cash cost table
- 1 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Shagang (BOF) steel plant
A detailed analysis of the Shagang (BOF) steel plant.
$2,250Cilegon (BOF) steel plant
POSCO PT Krakatau JV plans to double its BF-BOF production capacity before 2030.
$2,250Girilambone SxEw copper mine
A detailed analysis of the Girilambone SxEw copper mine.
$2,250