Pedra de Ferro iron ore mine
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
Tables and charts
This report includes 12 images and tables including:
- Detail Map
- Participation
- Marketable reserves (at 01/01/2024)
- Production
- Production
- Operations
- Infrastructure
- Cash cost (US$/tonne)
- Cash cost
- Capital costs (US$ million)
- Product quality
- Economic assumptions
What's included
This report contains:
Other reports you may be interested in
Robe River - Pannawonica iron ore mine
Pannawonica is one of two mines in Robe River JV and is operated by majority owner Rio Tinto. It currently has annual production of 30 Mtpa.
$2,250Iron Bridge iron ore mine
Iron Bridge is a magnetite mine in the Pilbara region of Western Australia. The production commenced in late April 2023.
$2,250Hamersley - Yandicoogina iron ore mine
Yandicoogina produces a low-Fe product (58.5%) but is valued for its low-alumina, low-phosphorous and coarse sizing.
$2,250