Asset Report

Horne copper smelter

Get this report*

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

The smelter was commissioned in 1927 with two coal fired, calcine charged reverberatory furnaces. In 1957 a wet charged, coal fired reverberatory furnace was added to treat custom concentrates. By 1970 economics dictated a change from coal to oil firing and in 1984 natural gas was made available as an alternative to oil. The Noranda reactor was installed in 1973 and operated with two reverberatory furnaces. Experiments with oxygen enrichment led to the installation of the large oxygen...

Table of contents

  • Emissions
  • Auxiliary plants

Tables and charts

This report includes 6 images and tables including:

  • Horne Emission Intensity Quartile Ranking - total global production - tonnes Cu
  • Detailed map
  • Flowsheet

What's included

This report contains:

  • Document

    Horne copper smelter

    PDF 1.56 MB