Asset Report

Hollister (Ivanhoe Restart) (Closed) gold mine

Get this report*

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

The Hollister mine is an underground operation that uses overhand drift and fill methods. Ore is processed at the Esmeralda conventional carbon-in-leach (CIL) plant, 290 miles from Hollister.In November 2013, production was stopped and 182 employees were laid off. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Mining
  • Processing
  • CAPEX

Tables and charts

No table or charts specified

What's included

This report contains:

  • Document

    Hollister (Ivanhoe Restart) gold mine

    XLS 114.50 KB

  • Document

    Hollister (Ivanhoe Restart) (Closed) gold mine

    PDF 1.26 MB