Asset Report

Hobart zinc smelter

Get this report*

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

The smelter at Hobart in Tasmania produces zinc using the roast, leach, electrowin technology. The leach residue is processed using the Para-Goethite process and the final residue sent for processing to the Port Pirie smelter in Australia. The capacity of the smelter is 280kt/a slab zinc and there are no plans to increase this. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Summary
  • Key issues
  • Emissions
  • 2019
  • 2018
  • 2017
  • 2016
  • 2015
  • 2011
  • Pre 2010
  • 2000-2009
  • 1990-1999
  • 1970-1989
  • 1910-1969

Tables and charts

This report includes 8 images and tables including:

  • Hobart Emission Intensity Quartile ranking – total global production - tonnes Zn
  • Detailed map
  • Flowsheet
  • Feed Preparation
  • Roaster and Acid Plant
  • Leaching and Purification
  • Tankhouse, Melting and Casting

What's included

This report contains:

  • Document

    Hobart zinc smelter

    PDF 1.63 MB