Asset Report

Hitachi copper refinery

Get this report*

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

The refinery is located at Hitachi, Ibaraki prefecture and has good road and sea links. Smelting operations commenced at Hitachi in 1908 to treat material from the Hitachi mine. No.1 tankhouse was commissioned in 1911 and capacity had reached 72kt/a cathode by 1969. No. 2 tankhouse was commissioned in 1969 with a capacity of 120kt/a cathode and No. 1 tankhouse was shut down in 1983. The Hitachi smelter was closed in 1976, subsequently; anodes have been supplied from the Saganoseki smelter...

Table of contents

  • Emissions

Tables and charts

This report includes 8 images and tables including:

  • Hitachi Copper Refinery Emission Intensity Quartile Ranking - total global production - tonnes Cu
  • Detailed map

What's included

This report contains:

  • Document

    Hitachi copper refinery

    PDF 1.59 MB