Asset Report

Enchi gold mine project

Get this report*

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

The Enchi project is being advanced by Newcore Gold Ltd. A preliminary economic assessment (PEA) study on the project was completed in Q2 2015 and updated in December 2015 to reflect a contractor-operated operation. An updated PEA was released in April 2024, assessing Enchi as a low-cost, open-pit, heap leach operation, processing 8.1mtpa with contract mining.

Table of contents

  • Summary
  • Key issues
  • Mining
  • Processing
  • Capex
  • Closure
  • Royalties

Tables and charts

This report includes 1 images and tables including:

  • Detailed Map

What's included

This report contains:

  • Document

    Enchi gold mine project

    XLS 116.50 KB

  • Document

    Enchi gold mine project

    PDF 1.27 MB