Asset Report

El Arco gold minesite project

Get this report*

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

In 2021 Grupo Mexico was anticipating an open pit mine and a conventional 110kt/a ore concentrator and a 35kt/a cathode plant. The SxEw plant will start first and one year later the concentrator. The initial capex was estimated at US$3000 million. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Summary
  • Power
  • Water
  • CAPEX

Tables and charts

This report includes 1 images and tables including:

  • Detailed map

What's included

This report contains:

  • Document

    El Arco Minesite Project gold mine

    XLS 116.50 KB

  • Document

    El Arco gold minesite project

    PDF 1.23 MB