Asset Report

Constellation (Closed) copper mine project

Get this report*

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

The accompanying analysis is based on the results of the preliminary economic assessment (PEA) released by the company in April 2016. This PEA assumes a conventional open pit operation for the Jose Maria deposit located in Argentina and a block caving underground mine for the Los Helados deposit located in Chile and a 150kt/d ore concentrator located in Argentina to produce a relative clean copper concentrate with an average grade of 29%Cu, 10.4g/t Au and 70g/t Ag. No moly production is expected.

Table of contents

  • Summary
  • Key issues
  • Capex
  • Operating
  • Mining
  • Processing
  • Royalties and taxes
  • Permitting
  • Community relations
  • Environmental reclamation

Tables and charts

This report includes the following images and tables:

What's included

This report contains:

  • Document

    Constellation (Closed) copper mine project

    PDF 1.22 MB