Cilegon (BOF) steel plant
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
-
Key issues
- Participation
- Steel plant overview
- Key raw materials rates
- Iron ore
- Coal
- Metallics
- Energy
- Capital costs
- Operating cash costs
Tables and charts
This report includes 11 images and tables including:
- Detailed map
- Finished steel production
- Production table (Mt)
- Capital costs
- Total operating cash costs: Finished steel
- Operating cash cost table
What's included
This report contains:
Other reports you may be interested in
Shagang (BOF) steel plant
A detailed analysis of the Shagang (BOF) steel plant.
$2,250Global steel cost summary
Global average steelmaking costs are expected to soften by 5.4% in 2025, driven by falling raw material and energy prices.
$6,750Scunthorpe (BOF) steel plant
British Steel has announced it will close down its blast furnaces in Scunthorpe by 2026, in a move to switch to EAF-based steelmaking.
$2,250