Asset Report

Bolanos zinc mine

Get this report*

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

In 2015, Bolaños operated the El Alacran underground mine and a conventional Pb-Zn flotation plant, with an actual capacity of 35kt/month (420kt/a) and there are not any expansion plans in place. Until the end of 2012 Bolaños processed some old tailings. Since then only fresh ore from the underground mine has been milled. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Summary
  • Key issues
  • Emissions
  • Mining
  • Processing
  • Royalties and taxes

Tables and charts

This report includes 2 images and tables including:

  • Bolanos Emission Intensity Quartile Ranking - total global production - tonnes Zn equivalent
  • Detailed map

What's included

This report contains:

  • Document

    Bolanos zinc mine

    XLS 408.00 KB

  • Document

    Bolanos zinc mine

    PDF 1.65 MB