The project is being developed in three phases. Surface oxide ores will be treated to recover gold and silver for the first two years of production. For the following three years copper concentrate will be produced from super-gene ore. Thereafter copper and zinc concentrates will be produced from the sulphide ore. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.