Berkeley steel plant
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
- Key issues
- Metallics
- Energy
- Capital costs
- Operating cash costs
Tables and charts
This report includes the following images and tables:
- Detailed map
- Participation
- Steel plant overview
- Key raw materials rates
- Downstream products
- Finished steel production
- Production table (Mt)
- Capital costs
- Total operating cash costs - Finished steel
- Economic assumptions
What's included
This report contains:
Other reports you may be interested in
Biron (Closed) gold mine
A detailed analysis of the Biron (Closed) gold mine.
$2,250Florida Canyon (including Standard Mine) gold mine
A detailed analysis of the Florida Canyon (including Standard Mine) gold mine.
$2,250Girilambone SxEw copper mine
A detailed analysis of the Girilambone SxEw copper mine.
$2,250