Maco gold mine is located in the Maco Municipality, 950km from the capital city of Manila. Access to the property by road is via a combination of paved (Pan-Philippine Highway) and unpaved roads from Davao. Mill plant capacity was expanded to 1.5kt/d in 2015, and record gold production was achieved in 2016. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.