Argentina launches Gas Scheme 2020-2024: What will drive price bids?
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Executive summary
- Introduction
- Features of the Gas Scheme tender
- Price bid mechanism
- Dealing with legacy price subsidies
-
Pricing strategies
- Internal rate of return drivers
- Marginal cost of supply
- Final remarks
Tables and charts
This report includes the following images and tables:
- Volumes required in Gas Scheme 2020-2024 by basin and type vs total Argentina gas demand
- Uncontracted committed production capacity versus Argentina’s remaining gas demand from the Gas Scheme 2020-2024
- Commercial details of the Gas Scheme 2020-2024
- Net present value divided by the gas sales at a 10% interest rate must be lower than US$3.21/mmbtu
- Maximum price calculated based on 3 Mcmd of injected volume from Neuquen to GBA
- Nominal and adjusted annual revenue for the maximum price with 3 Mcmd
- Price comparison between local and international references and price cap from Gas Scheme 2020-2024
- Bullish and Bearish factors for price bids
- Neuquen compositve supply cost curve (2024) vs gas demand requirements
What's included
This report contains:
Other reports you may be interested in
Estacion Fernandez Oro
Estación Fernández Oro is a tight gas development from the Lajas formation, which is located in the province of Rio ...
$3,720Fortin de Piedra
Fortin de Piedra is Tecpetrol's premiere Vaca Muerta development. The company sanctioned the project in 2017 and ramped up ...
$3,720Chile power: Investment Horizon Outlook 2024
The country outlook provides historical/actual data of our analysis of the power value chain in Chile until 2034.
$8,000