Asset Report

Mitra Energi Agung coal mine

Get this report*

$2,550

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

Mitra Energi Agung is a greenfield coal asset located in East Kalimantan. It is 60% owned by Indika Energy. The mine operates using IUP in an area of 5,000 Ha. The mine is currently under exploration stage, with more than 90% of the concession been explored. MEA is at the stage of securing all critical licenses required to commence production. Production is expected to commence in 2026. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Summary
    • Participation
    • Coal seams
    • Production
    • Operations
    • Infrastructure
    • Cash costs
    • Product quality
    • Economic assumptions

Tables and charts

This report includes the following images and tables:

  • Detailed map
  • Production
  • Cash costs
  • Capital costs
  • 1 more item(s)...

What's included

This report contains:

  • Document

    Mitra Energi Agung coal mine

    PDF 1.08 MB

  • Document

    Coal asset - Mitra Energi Agung data - August2024.xlsx

    XLSX 170.58 KB